India TEC has announced the lists for Phase III and Phase IV products that will require India TEC (Telecommunication Equipment Certification).
- Applications for Phase III will be accepted beginning October 11th, 2021, with all Phase III products requiring mandatory certification beginning July 1st, 2022.
- Applications for Phase IV, Part One products will be accepted beginning October 11th, 2021, with all Phase IV, Part One products requiring mandatory certification beginning February 1st, 2022.
- Applications for Phase IV, Part Two products will be accepted beginning October 11th, 2021 with all Phase IV, Part Two products requiring mandatory certification beginning July 1st, 2022.
Phase IV products are separated into two parts based on India’s Essential Requirements (ER), or technical regulations. Phase IV, Part One products are based upon EMC/EMI and Safety Test Report Essential Requirements, and Phase IV, Part Two products are based upon additional parameters of Essential Requirements mandated by the Indian government.
Below are the Phase III and Phase IV categories:
Phase III
Applications accepted beginning October 11th, 2021
Certification Mandatory: July 1st, 2022
SI. No. | Name of Product |
1 | Base Station for Cellular Network |
2 | Repeater for Cellular Network |
3 | Compact Cellular Network |
4 | Smart Camera |
5 | Smart Watch |
6 | Smart Electricity Meter |
7 | Tracking Device (with Embedded SIMs) |
8 | IoT Gateway |
9 | End Point Device for Environmental Monitoring |
10 | Equipment Operating in 2.4 GHz and 4 GHz Band |
Phase IV, Part One
Applications accepted beginning October 11th, 2021
Certification Mandatory: February 1st, 2022
SI. No. | Name of Product |
1 | Transmission Terminal Equipment (DWDM, DXC) |
2 | Optical Fibre (Single Mode) |
3 | Satellite Communication Equipment |
4 | Radio Broadcast Receiver |
5 | Mobile Radio Trunking System |
6 | HF Radio |
7 | VHF/UHF Radio System Equipment |
8 | PTP PMP Microwave Fixed Radio Systems |
9 | IP Security Equipment |
10 | Router |
11 | LAN Switch |
12 | Precision Timing Protocol Grand Master Equipment |
13 | IP Multi Media Conference Equipment |
14 | Mobility Management Entity (MME) |
15 | Point of Sale Devices |
Phase IV, Part Two
Applications accepted beginning October 11th, 2021
Certification Mandatory: July 1st, 2022
SI. No. | Name of Product |
16 | Conferencing Equipment |
17 | Signaling Gateway |
18 | Media Gateway |
19 | Softswitch |
20 | Digital Subscriber Line Equipment |
21 | Session Border Controller |
22 | Base Station Controller (BSC)/ Radio Network Controller (RNC) |
23 | Mobile Switching Centre (MSC)/ MSC-Server (MSC-S)/ Gateway MSC (GMSC)/ Gateway MSC- Server (GMSC-S) [including Visitor Location Register (VLR)] MSC/ MSC Server |
24 | Equipment Identity Register (EIR) |
25 | Subscriber Identity Module (SIM) |
26 | OTA Platform and Device Manager Platform/ FOTA |
27 | Home Location Register (HLR)/ Home Subscriber Server (HSS)/ Authentication Centre (Auc) |
28 | Server GRPS Support Node (SGSN)/ Gateway GPRS Support Node (GGSN) |
29 | Serving Gateway (S-GW)/ Packet Gateway (P-GW) |
30 | Mobility Management Entity (MME) |
31 | Short Message Service Center (SMSC) |
32 | Cell Broadcast Centre (CBC) |
33 | Service Control Point (SCP) |
34 | Operation Maintenance Center (OMC)/ Element Management System (EMS)/ Network Management System (NMS)/ Operation Support Systems (OSS) |
35 | Gateway Mobile Location Centre (GMLC) |
36 | Serving Mobile Location Centre (SMLC) |
For additional information, please contact G&M Compliance, Inc. at 714-628-1020
Comments are closed.