On April 9, 2024, the India Ministry of Electronics and Information Technology (MEITY) issued an important update regarding, CCTV cameras & systems. Below are the details. Beginning October 9th, 2024,... read more →
In a previous post, the UK Department for Business, Energy, and Industrial Strategy (BEIS) announced the delay of the UKCA marking to January 1st, 2023. BEIS has now granted an... read more →
Contact the Utility Upfront: When making connections or modifications to switchgear on the line side of the service disconnect, we recommend contacting the utility to notify them of your intentions. ... read more →
Taiwan has implemented the following two (2) new standards, which will be compulsory beginning January 1st, 2024. NewOldEMCCNS 15936(105 Version)CNS 13438 (IT)CNS 13439 (AV)SafetyCNS 15598-1(109 Version)CNS 14336-1 (IT)CNS 14408 (AV)New... read more →
Manufacturers of many product types selling into India, need their power supplies to be BIS certified. Many of these OEMs can't get BIS approval for their products because the system... read more →
India TEC (Telecommunications Engineering Center) has announced an update to the rollout of their Lists III and IV. In a previous post, it was advised these lists would become mandatory... read more →
Tier I Market Requirements Tier I markets generally consist of North America and Europe. For laboratory equipment manufacturer’s, fortunately the safety standard (EN/CAN/UL 61010-1) is harmonized between the U.S./Canada, and... read more →
The local building department inspector, aka the Authority Having Jurisdiction (AHJ) is the party with the final say regarding the National Electrical Code (NEC). The NEC is the primary document... read more →
With the popularity of Solar, battery backup systems, and additions to commercial and residential properties, line-side and load-side taps to existing switchgear have become common. Tapping into existing switchgear is... read more →
On August 24th, 2021, the UK Department for Business, Energy & Industrial Strategy (BEIS) announced the delay of the UKCA marking until January 1st, 2023. This means, those products that... read more →